Work Breakdown (WB)

| January 25, 2014

[meteor_slideshow slideshow=”adssa” metadata=”height: 126, width: 630″]
Order Details
WBS Create a work breakdown structure (WBS) for a project you have involved in professionally, or a common activity around the house that would span more than one month. This particular WBS can be in outline form, with more than two but no more than five high level work packages with no more than 3 tasks in each work package. Assign resources to each task, and provide an appendix for the high level skills required for the task. Identify one work package that could use a contingency plan, and write describe that plan in one hundred words or less. Use an APA cover page and formatting to satisfy University requirements. Example WBS: Project Name – New Swimming Pool Create Budget – 2 weeks Task 1- Accountant Task 2- Accountant Design Pool – 2 weeks Task 1- Designer Task 2- Designer Build Pool – 6 Weeks Task 1- Construction Task 2- Construction References Barkley, B. (2006). Integrated project management. New York, NY: McGraw-Hill.
[meteor_slideshow slideshow=”best” metadata=”height: 126, width: 630″]

Get a 5 % discount on an order above $ 150
Use the following coupon code :
2020Discount
Bureaucracy in Public Sector
Apply risk methodologies to economic situations using a variety of approaches ranging from basic statistics to certain equivalency

Tags:

Category: Accounting

Our Services:
Order a customized paper today!