Planning as a chief engineer

| August 9, 2016

Paper , Order, or Assignment Requirements

 

Please  submit your assignment in the locker adjacent to F90, bearing my name Mohan Anantharaman, and ensure you sign and attach a cover sheet.

You are a Chief Engineer on a large tanker  180,000  Dwt installed with large slow speed engine directly coupled to the propeller. You may choose any slow speed engine of your choice, and you need to mention the specifications of the chosen engine. The vessel is classed by NK Class, Japan, who permit Chief Engineer to carry out survey, which will be endorsed by NK, subject to verification of a Chief Engineer’s report.( You may choose a different Classification Society of your choice, if you so desire). You are required to open up the following machinery for a class survey, assuming  a port stay of 5 days on this occasion.

  1. One cylinder unit complete which includes the cylinder head mountings, Liner, Piston, Piston rod and gland.
  2. One Cross head pin and bearing complete.
  3. One Connecting rod pin bearing complete
  4. One Main bearing and journal.

Prepare a detailed report of the above survey undertaken.

Your report  should include the following:

  1. Planning of the activities. 5 Marks

 

  1. All safety precautions taken in the activities.                                                                      5 Marks

 

  1. Thorough investigation of the machinery components of the main engine 10 Marks

 

  1. A detailed report based on your examination.   10 Marks

 

  1. Details of spare parts used.    5 Marks

 

  1. Any repairs or additional work carried out.     5 Marks

Get a 5 % discount on an order above $ 150
Use the following coupon code :
2018DISC
Management Principles
Visual Perception Vs Visual performance

Tags:

Category: Uncategorized

Our Services:
Order a customized paper today!