Hazardous Waste Incinerator

| February 25, 2014

[meteor_slideshow slideshow=”adssa” metadata=”height: 126, width: 630″]
Order Details
A community wants to construct a hazardous waste incinerator for household hazardous waste. The cost of the facility is expected to be $4,000,000. The cost of operating this facility is estimated to be about $20,000 per year plus salaries of $100,000 annually. The insurance on the facility will be $3,000 per year. What is the annual cost if this facility to the community? Assume that the facility will have a useful life of around 15 years.
[meteor_slideshow slideshow=”best” metadata=”height: 126, width: 630″]

Get a 5 % discount on an order above $ 150
Use the following coupon code :
2018DISC
Corporate Social Responsibility (CSR) helps achieve objectives of sustainability an area (aspect) of philanthropic
Construction Development in China

Tags:

Category: Engineering

Our Services:
Order a customized paper today!